Immingham Renewable Fuels Terminal

Contract to design and construct a facility for importing, storing and onward transfer of renewable fuels (wood pellets) at the Port of Immingham. Provision of Continuous Ship Unloaders - two offloading pellets from ships and capable of handling 2,500 tonnes per hour, Conveyor systems including numerous transfer towers- circa 1.2km of conveyors, handling 2,500 tonnes per hour, Storage facilities- storing 100,000 tonnes including all fire suppression, heat monitoring and dust extraction systems,Site ancillary works and electrical distribution services to include: Site lighting Substations Roadway and external paving Site drainage On sites pares storage facility.

Project Overview:

  • Principal Contractor:  Associated British Ports
  • Client: Graham Construction
  • Project: Nitrogen System Installation For Immingham Biomass Project.
  • Value:  £60m
  • GMK Contract Value:  £500,000.00

GMK Services Provided:

  • Project Management
  • Health & Safety Management
  • Supply,Fabrication and Installation of Stainless Steel Nominal Bore High Pressure  Pipework System ranging from DN50 to DN150
  • NDT Testing of Pipework to 10% X-Ray and 100% Dye-Pen
  • Supply, Fabrication and Installation of Galvanised Mild Steel Pipework Support Structures
  • FullTesting and Commissioning of Installed Systems
  • Provision of As-built Drawings and Operation and Maintenance Manuals