Structural Steel work

Design,Supply, Fabrication, Galvanising and Installation of Steel Support Bridge spanning across access road. GMK also carry out Pipework Support structures,pipe racks and standard pipework supports similar to above. All are pre-fabricated in GMK workshop facility and galvanised prior to being shipped to site for installation. Finish on Bridges and Pipework supports can be either steel, shot blast, primed and painted or Galvanised to either 80µm (standard) or 140µm for Water and Waste Water Plants. GMK also carry out a full range of Stainless Steel Pipework Supports in both Grade 304 and 316 grades.

Steelwo 4.JPG

Design,Supply, Fabrication, Galvanising and Installation of Steel Support Bridge inside concrete clarifier tanks. Finish on Clarifier Bridge is Galvanised to either to 140µm. Clarifier Bridge consists of Tripod Assembly, Drum Assembly, Bridge Assembly including walkway, Hand railing, Kicker Plates and access ladder, Low level scrapper assembly, trough scrapper assembly and overflow trough assembly.All installed within millimeter tolerances.

uploads/jpg/1421074538  Z Access platforms to Lanellas.jpg

Design,Supply, Fabrication, Galvanising and Installation of Access Stairway at Lamella Tanks. Finish on Access Stairway is Galvanised to 140µm. Access Stairway is installed to British Standards. Stairway Staircases, Flow forge Landings,Walkway, Handrailing, and Kicker Plates.

Design,Supply, Fabrication, Galvanising and Installation and Testing of Lifting Beam Assembly at Lamella Tanks. Finish on Lifting Beam is Galvanised to 140µm with the main Rail of the lifting beam painted.


Certified & Trusted

© Copyright 2024 GMCK Gallagher & McKinney Ltd. All Rights Reserved